Description: Status: Updated continuouslyContact: Grant McCormick, UA PDC, 520-626-4416. grantmc@email.arizona.eduIntended Use: Map displaySupplemental Information: FC is currently used in maps without any use of attribute data given that available fields are not currently populated.Fields: (updated 2/5/14)OBJECTID:Shape:Shape.len:Shape.area:SurfaceCrossType:OverType:UnderType:CurbType:PathMaterials:Striped:UASiteID:Name:EmergencyAccess:
Copyright Text: The University of Arizona, Enterprise GIS
Description: bike_rte displays official bike routes.
Known Errors/Qualifications: Most bike routes are street centerline coincident linework and shared-use-paths and some planned bike paths were screen digitized from orthophotography based on the infomation provided by the jurisdictions.
Lineage: Updated with TDOT bike map recieved from Tom Thivener 06/16/09
Updated with September 2009 Tucson Metro Bike Map. 09/15/09
Updated with Special Bikeway name. 04/01/2010
Updated with Matt's comments on the Tucson Metro Bike Map 06/29/2010.
Updated with Bike map 2011-2012 Edition 09/13/2011.
Spatial Domain: Eastern Pima County
Rectified: parcel
Maintenance Organization: PC ITD GIS
Maintenance Description: Coordintate with Matt, Kaoru updates RTBL_st_bike_rte related table and digitizes the bike_path feature class that are not in STNET feature class from Orthophotography based on the information provided by jurisdiction as STNETGDB_BIKERTE feature class. If the bike path is designated as a Spacial Bikeway, the special bikeway name is entered in the NAME_BKWY field.
Major updates are intended to be done every 3 years, as that is when PAG officially approves a new map.
Maintenance Frequency: Annually
Maintenance Format: GDB Spec Export
Primary Source Organization: Bicycle & Pedestrian Program
Primary Source Contact: Matt Zoll
Primary Source Document: Tucson Metro Bicycle Map
Primary Source Date: 2009
Primary Source Scale: 56320
Primary Source Format: Paper
Secondary Source Scale: 12000
GIS Contact: Kaoru Johansen
MapGuide Layer Name: Bicycle Routes
MapGuide Scale Range: 0 - 200000
Copyright Text: Pima County Information Technology Department - Geographic Information Systems
201 N Stone Ave., 9th Floor
Tucson, AZ 85701
Description: STATUS: completed September 2012CONTACT: data created by Jim Robinson (TDOT, 837.6734) based on autocad file from HDR Architecture (consulting group working on street car design - contact person: Michael Barton Michael.Barton@hdrinc.com). STOP and ART fields added by Johanna Kraus based on http://www.tucsonstreetcar.com/documents/RouteMapwithArtistNames.pdfINDENTED USE: mapping and planning purposes
Description: Status: Maintained as needed using ArcMap.Abstract: Locations of modern streetcar routeOriginally version of layer created by COT for the Downtown projects website
Description: Status: UPDATED continuously as buildings change.Contact: Grant McCormick, UA PDC, 520-626-4416. grantmc@email.arizona.eduIntended Use: For map display.Supplemental Information:Fields: (7/5/11)OBJECTID:Shape:fldBuildNumtxt:Shape_Length:Shape_Area:BuildingID:Name:Use:ShowMe:SpaceNumDbl:RuleIDDS:OverrideDS:
Restrictions: Coded Values:
[EV Charging: EV Charging]
, [Pay by Plate: Pay by Plate]
, [Disabled Pay by Plate: Disabled Pay by Plate]
, ...1 more...
TimeLimit: Inherited
TimeControlled: Inherited
DaysControlled: Inherited
Location: Inherited
Orientation: Inherited
ID: 3
Name: Loading Zone
Domains:
IsCompact: Inherited
Restrictions: Coded Values:
[Standard Loading Zone - 20 Mins: Standard Loading Zone - 20 Mins]
TimeLimit: Inherited
TimeControlled: Inherited
DaysControlled: Inherited
Location: Inherited
Orientation: Inherited
ID: 4
Name: Other
Domains:
IsCompact: Inherited
Restrictions: Coded Values:
[Building Specific Visitor: Building Specific Visitor]
, [Centennial Hall Courtesy: Centennial Hall Courtesy]
, [Other: Other]
, ...4 more...